Transport infrastructure / roads

Project

Preparation of Ecoduct Design at Km 27+825 of the New Lianokladi–Domokos Railway Line, in compliance with the approved Environmental Terms

Location:  Central Greece
Client:  Erga Ose S.A. (Greek Railways Infrastructure Works) 
Date:  2020 – 2021
Construction costs:  approx. € 1,6 million
Technical Details

The project involves the construction of an ecoduct on an unpaved rural road at Km 27+827.68 of the already completed and operational “Lianokladi – Domokos“ railway line, designed to monitor wolf behavior.

The ecoduct is a single-span bridge with a length of 22 m and a width of 10.9 m. Its superstructure consists of precast, prestressed beams, supported by piers and abutments through bearings. A deep foundation system with piles has been implemented to ensure stability and durability.

Services Provided

OBERMEYER elaborated the final Structural design of the new bridge, the geotechnical design and tender documents.