The terminal is a two-storey structure, which retains its L-shaped footprint. The expansion is a linear volume that occupies the almost entire landside length of the existing terminal building T2. Passenger flows for Schengen and non-Schengen operations are fully segregated, with adaptable areas that can dynamically accommodate fluctuations in real-time demand.
The facility encompasses a total functional area of 9,526 m², 2,185 m² of which relate to the extension. The total built area is 8,746 m².
All architectural design phases were subject to oversight by the Independent Engineer, who reviewed the documentation and issued the Design Approval Certificate. The design was also approved by the Hellenic Civil Aviation Authority. Construction was completed in 2021, with as-built documentation duly submitted.
Services Provided
OBERMEYER was responsible for the full scope of architectural design services, delivered in four primary stages: baseline/functional design, permit design and detailed design as well as as-built documentation. OBERMEYER’s scope included several supporting designs/studies: energy efficiency study, accessibility design, master key study, colour study, acoustic design and signage design. OBERMEYER also undertook all permitting procedures. Furthermore, OBERMEYER provided technical assistance to the Contractor regarding design change requests during construction.
Surveys:
- Geodetic (topographical) surveys
- Geotechnical Surveys
Design:
– Detailed design for all Civil Works (substructure, superstructure, structures)
- alignment – substructure
- railway superstructure
- bridges
- tunnels
- overpasses/underpasses
- retaining walls, culverts
- drainage
- formation setting
- railway stations and halts, including buildings, platforms, and canopies etc.
- disposal sites / borrow pits
- expropriations
- Design of signalling and telecommunication systems
– Design of electrification system
– Technical Specifications for Interlocking and Communication Equipment.
– Electrification Design
Tender Documents:
- Technical part (arising from the approved designs)
- Legal part: Procurement Plan, Tender Documents, Prequalification Documents, Evaluation Reports, Special Conditions of FIDIC Contract
Similar projects

This is the heading
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.