Transport infrastructure / rail
Project
New Railway Line Thessaloniki – Amfipoli – Kavala, Greece
Location: Greece
Client: OSE S.A. (Greek Railways Organization)
Date: 2018
Construction costs: approx. € 3,8 million
Technical Details
The project involves the preliminary design for the New Railway Line Thessaloniki – Amfipoli – Kavala, with a total length of 174 km. OBERMEYER’s assignment includes the design of all the road structures included therein, a total of 69 road overpasses and underpasses.
Services Provided
The scope of services includes the execution of the preliminary design for 69 road overpasses and underpasses according to European and Greek regulations.
Surveys:
- Geodetic (topographical) surveys
- Geotechnical Surveys
Design:
– Design for all Civil Works (substructure, superstructure, structures)
- alignment – substructure
- railway superstructure
- railway bridges
- road/animals overpasses/underpasses
- retaining walls, culverts
- drainage
- formation setting
- platforms at railway stations and halts
– Environmental Design
Design Supervision:
- Design Supervision Services during construction for all sections / construction objects / construction permits in accordance with Country’s construction legislation and current Technical Specification with the involvement of the experts responsible in the Design Services